background image
SERVICE MANUAL
DA
TA
BASIC VIDEO MECHANISM : D-33
(6721R-0152A)
STEREO VIDEO
CASSETTE RECORDER
HV-FX5210
S/M Code No. 09-003-341-5N1
EHF EHAF


background image
2
TABLE OF CONTENTS
SPECIFICATIONS ............................................................ 3
ACCESSORIES LIST ....................................................... 3
DISASSEMBLY INSTRUCTIONS ..................................... 4
SERVICE POSITION ........................................................ 5
VCR TEST TAPE INTERCHANGEABILITY TABLE ........ 6
ELECTRICAL MAIN PARTS LIST .............................. 7 ~ 9
TRANSISTOR ILLUSTRATION ........................................ 9
WIRE HARNESS DIAGRAM .......................................... 10
BLOCK DIAGRAM ................................................. 11 ~ 20
SCHEMATIC DIAGRAM
1. POWER SECTION .............................................. 21 ~ 22
2. AUDIO/VIDEO SECTION .................................... 23 ~ 24
3. SYSCON/SERVO/OSD SECTION ...................... 27 ~ 28
4. Hi-Fi SECTION .................................................... 29 ~ 30
5. TUNER/IF SECTION ........................................... 31 ~ 32
6. NICAM SECTION ................................................ 33 ~ 34
7. FRONT-1 C.B .............................................................. 37
8. FRONT-2 C.B .............................................................. 37
WAVEFORM
1. VIDEO SECTION ........................................................ 25
2. SERVO/OSD SECTION .............................................. 26
3. TUNER/IF SECTION ................................................... 32
4. NICAM SECTION ........................................................ 34
WIRING
1. MAIN C.B SECTION ........................................... 35 ~ 36
2. FRONT 1 C.B SECTION ............................................. 38
3. FRONT 2 C.B SECTION ............................................. 38
4. NICAM SECTION ........................................................ 39
IC DESCRIPTION ................................................... 40 ~ 45
IC BLOCK DIAGRAM ..................................................... 46
FL DISPLAY ................................................................... 47
ADJUSTMENT ........................................................ 48 ~ 49
MECHANICAL EXPLODED VIEW 1/1 ........................... 50
MECHANICAL MAIN PARTS LIST 1/1 ......................... 51
MECHANISM EXPLODED VIEW 1/3, 2/3, 3/3 ..... 52,54,56
MECHANISM MAIN PARTS LIST 1/3, 2/3, 3/3 .... 53,55,57
DECK MECHANISM PARTS LOCATIONS
Top View .......................................................................... 58
Bottom View .................................................................... 58
DECK MECHANISM DISASSEMBLY
1. Drum Assembly ......................................................... 59
2. Plate Assembly Top ................................................... 61
3. Holder Assembly CST ............................................... 61
4. Guide CST ................................................................ 61
5. Bracket Side (L)/Bracket Assembly Door .................. 61
6. Arm Assembly F/L ..................................................... 61
7. Lever Assembly S/W ................................................. 61
8. Arm Assembly Cleaner .............................................. 62
9. Head F/E ................................................................... 62
10. Base Assembly A/C Head ......................................... 62
11. Brake Assembly S ..................................................... 63
12. Brake Assembly T ..................................................... 63
13. Arm Assembly Tension .............................................. 63
14. Reel S & Reel T ........................................................ 63
15. Support CST ............................................................. 64
16. Base Assembly P4 .................................................... 64
17. Opener Lid ................................................................ 64
18. Arm Assembly T/up ................................................... 64
19. Arm Assembly Pinch ................................................. 64
20. Belt Capstan/Motor Capstan ..................................... 65
21.Clutch Assembly D33 ................................................. 65
22. Lever F/R .................................................................. 65
23. Gear Assembly H-Up/D or Gear Assembly Up/D ...... 65
24. Bracket Assembly Jog ............................................... 66
25. Guide Rack F/L, Gear Rack F/L ................................ 66
26. Brake Assembly Capstan .......................................... 66
27. Gear Drive/Gear Cam/Gear Connector .................... 67
28. Bracket Assembly L/D motor ..................................... 67
29. Gear Sector ............................................................... 68
30. Base Tension/Plate Slider/Lever Tension .................. 68
31. Gear Assembly P3/Gear Assembly P2 ..................... 69
32. Base Assembly P3/Base Assembly P2 ..................... 69
33. Arm Assembly Idler Jog or Arm assembly Idler ......... 69
DECK MECHANISM ADJUSTMENT
Tools and Fixtures for service ......................................... 70
1. Mechanism Alignment Position Check ........................ 71
2. Preparation for Adjustment ......................................... 72
3. Checking Torque ......................................................... 72
4. Guide Roller Height Adjustment .................................. 73
4-1. Preliminary Adjustment .......................................... 73
4-2. Precise Adjustment ................................................ 73
5. Audio/Control (A/C) Head Adjustment ......................... 74
5-1. Preliminary Adjustment .......................................... 74
5-2. Confirm that the Tape Path smoothly between
the Take-up Guide and Pinch Roller ..................... 75
5-3. Precise Adjustment (Azimuth Adjustment) ............. 75
6. X-Value Adjustment ..................................................... 75
7. Adjustment after Replacing Drum Assembly
(Video Heads) ............................................................. 76
8. Check the Tape Travel after Reassembling
Deck Mechanism ......................................................... 76
8-1. Checking Audio and RF Locking Time
during Playback and after CUE or REV ................ 76
8-2. Check for Tape Curling or Jamming ....................... 76
MAINTENANCE/INSPECTION PROCEDURE
1. Check before starting Repairs .................................... 77
2. Required Maintenance ................................................ 78
3. Scheduled Maintenance ............................................. 78
4. Supplies Required for Inspection and Maintenance ... 78
5. Maintenance Procedure .............................................. 78
5-1. Cleaning ................................................................. 78
5-2. Greasing ................................................................ 79
MECHANISM TROUBLESHOOTING GUIDE
1. Deck Mechanism ........................................................ 80
2. Front Loading Mechanism .......................................... 83


background image
3
REF. NO
PART NO.
KANRI
DESCRIPTION
NO.
ACCESSORIES LIST
1
S8-35R-P00-50F
INSTRUCTION ASSY
2
S7-11R-1P0-16E
REMOTE CONTROLLER A
2
S7-12R-293-8GA
REMOCON RECEIVER
3
S5-640-18B-000
PLUG ASSY PHONO CORD
4
S8-610-33B-000
CABLE SET ASSY
SPECIFICATIONS
· Design and specifications are subject to change without notice.
Video recording system
Rotary 2 head helical scanning system
Video head
Double azimuth 4 heads
Tuner system
Frequency synthesized tuner
TV system
B/G
Video signal system
PAL color signal, 625 lines, 50 fields
Usable cssettes
VHS video cassettes
Recording/playback time
PAL/MESECAM
SP: 5 hours max. with E-300 tape.
LP: 10 hours max. with E-300 tape
NTSC (Playback only)
SP: 3 hours 30 minutes max.
with T-210 tape
LP: 7 hours max.
with T-210 tape
EP: 10 hours 30 minutes max.
with T-210 tape
Tape speed
PAL/MESECAM
SP: 23.39 mm/sec.
LP: 11.69 mm/sec.
NTSC (Playback only)
SP: 33.35 mm/sec.
LP: 16.67 mm/sec.
EP: 11.12 mm/sec.
Rewind time:
Approx. 3 min. with E-180 tspe
Channel coverage
VHF-low: C02 to C04, C13 to C20,
S01 to S07 (CATV)
VHF-high: C05 to C12, S08 to S41
(CATV)
UHF: C21 to C71
Video input
1.0 Vp-p, 75 ohm, unbalanced
Video output
1.0 Vp-p, 75 ohm, unbalanced
Horizontal resolution
240 lines (SP)
Video S/N
43 dB (SP)
Audio track
3 tracks (Hi-Fi sound 2 tracks,
Normal sound 1 track)
Audio input
SCART: -5 dBs, more than 10 k ohm
Audio output
SCART: -5 dBs, less than 1 k ohm
Hi-Fi frequency response 20 Hz - 20 kHz
Hi-Fi dynamic range
More than 80 dB
Hi-Fi Wow & Flutter
Less than 0.01%(nominal)
Operating temperature:
5
°C to 40 °C
Power requirements
200 - 240 V AC, 50 Hz
Power consumption
20 watts
TYPE 3.5 watts (power save mode.)
Dimensions
360 (W) x 278 (D) x 95 (H) mm
(141/
4 x 11 x 3
3/
4 in.)
Weight
Approx. 3.4 kg (7.48 lbs.)
5
S8-615-05R-000
CABLE ASSY
REF. NO
PART NO.
KANRI
DESCRIPTION
NO.


background image
4
DISASSEMBLY INSTRUCTIONS
1. Top Case Removal
1) Remove 4 screws holding the top case.
2. Panel Front Removal (see Fig. 1)
1) Release 7 tabs, and then remove the panel front.
Fig. 1
3. Front-1 C.B. and Front-2 C.B. Removal (see Fig. 2)
1) Release 2 tabs, and then remove front-1 C.B. from the
connector (PKM02) in the direction of arrow (1).
2) Release the tab, and then remove front-2 C.B. from the
connector (PKM01) in the direction of arrow (2).
Fig. 2
4. Mechanism Removal (see Fig. 3)
1) Disconnect the drum FF cable from the connector
(PMD01) on the Main C.B.
2) Disconnect the ACE head FF cable from the connector
(P3D02) on the Main C.B.
3) Remove 6 screws (A).
Fig. 3
5. Main C.B. Removal (see Fig. 4)
1) Remove 2 screws (B) holding the panel assy, distri-butor.
2) Release 5 tabs, and then simultaneously lift the panel as-
sembly, distributor and Main C.B. to remove them.
Fig. 4
TAB
PANEL
FRONT
PANEL ASSY,
DISTRIBUTOR
MAIN C,B
TAB
TAB
TAB
TAB
TAB
B
PKM02
TAB
TAB
TAB
(1)
(2)
PKM01
Front-1 C,B
Front-2 C,B
MAIN C,B
FF CABLE
FF CABLE
PMD01
P3D02
A
A
A


background image
5
SERVICE POSITION
To set the mechanism to the service position in active status:
Insert a spacer as shown below: The service position can be set in the stable status without any defective contact.
Location
Install spacers at locations (A) and (B).
MAIN C.B
D33 MECHANISM
SPACER
60mm
MAIN C.B
D33
MECHA
SPACER
REAR PANEL
Use a spacer with a diameter of 10-15 mm,
and of any shape (round, square, etc.).
Caution: The spacer must be of insulated
material, of a size that does not hinder
the mechanism loading.
Side view
A
B
CYLINDER
HEAD CLEANER
D33 Mechanism Top View